Case Study

114 GREY ST, SOUTH BRISBANE

SOUTH BRISBANE QLD 4101

PRESSURE CLEANING · ROPE ACCESS · WINDOW CLEANING
All Projects

Full building washdown, pressure cleaning and external window cleaning, completed on night shift using rope access and EWP.

A full building washdown at this South Brisbane building, including pressure cleaning of the whole building and cleaning of external windows that can't be reached from inside.

The challenge

Works had to be completed on night shift, and reaching every part of the building required a combination of rope access and elevating work platforms (EWP). Our team planned the job around both access methods to complete the whole building.

Scope of works

  • Full building washdown and pressure cleaning
  • External window cleaning on inaccessible windows
  • Night-shift works using rope access and EWP
Got a similar building? Get a free quote